国产欧美精品一区二区,中文字幕专区在线亚洲,国产精品美女网站在线观看,艾秋果冻传媒2021精品,在线免费一区二区,久久久久久青草大香综合精品,日韩美aaa特级毛片,欧美成人精品午夜免费影视

基于智能視覺(jué)和BIM的建筑裝配過(guò)程的高精度控制
CSTR:
作者:
作者單位:

(臺州職業(yè)技術(shù)學(xué)院,浙江 臺州 318000)

作者簡(jiǎn)介:

張俊強(1977),男,河南洛陽(yáng)人,碩士研究生,講師,主要從事土木工程技術(shù)、工程管理、工程經(jīng)濟方向的研究。 [FQ)]

通訊作者:

中圖分類(lèi)號:

基金項目:

臺州市科技計劃項目(2017);浙江省建設科研項目(2014Z156)。


High Precision Control of Building Assembly Process Based on Intelligent Vision and BIM
Author:
Affiliation:

(Taizhou Vocational &Technical College,Taizhou 318000,China)

Fund Project:

  • 摘要
  • |
  • 圖/表
  • |
  • 訪(fǎng)問(wèn)統計
  • |
  • 參考文獻
  • |
  • 相似文獻
  • |
  • 引證文獻
  • |
  • 資源附件
  • |
  • 文章評論
    摘要:

    為了確保建筑裝配過(guò)程能實(shí)現開(kāi)發(fā)商定義的工業(yè)化標準,需要進(jìn)行建筑裝配過(guò)程高精度控制。使用當前方法在建筑裝配的過(guò)程中對建筑裝配成本、質(zhì)量的控制效果達不到開(kāi)發(fā)商的要求;為此,提出一種基于智能視覺(jué)和BIM的建筑裝配過(guò)程高精度控制方法;首先采用BIM技術(shù)通過(guò)計算機虛擬建筑裝配場(chǎng)地布置,建立BIM建筑裝配模型,并在BIM建筑裝配模型中輸入建筑配件以及施工項目相關(guān)的所有信息,其次,在BIM建筑裝配模型的各個(gè)施工構件上加上時(shí)間參數和成本計劃,構成5D BIM建筑裝配模型,對優(yōu)化完成的5D BIM建筑裝配模型進(jìn)行虛擬建造,調整進(jìn)度和成本計劃,進(jìn)而將BIM和智能視覺(jué)技術(shù)相結合,實(shí)現整個(gè)建筑裝配過(guò)程的三維可視化指導操作;實(shí)驗結果表明,所提方法能夠有效提高施工效率,且建筑裝配成本控制精度較高。

    Abstract:

    In the construction engineering and intelligent visual assembly BIM has been widely used in the assembly process, building BIM for high precision control of assembly cost of construction, in the construction of the assembly process is intelligent vision in order to achieve the high-precision control of the construction process. The assembly quality of the current method is used in the construction of the assembly and assembly cost control of construction. The quality is not up to the requirements of developers. Therefore, a kind of architectural vision and BIM assembly process intelligent control method based on high precision. Firstly using BIM technology through the computer virtual assembly building site layout, building BIM building assembly model, and in the BIM assembly building mode All the information input, construction fittings and construction projects related to the type in the second, plus time parameters and cost plan in each construction member BIM building on the assembly model, assembly model construction 5D BIM, virtual construction optimization of the completion of the 5D BIM building assembly model, adjust the schedule and cost, and then BIM and intelligent the combination of visual technology, 3D visualization instruction operation to achieve the whole building assembly process. The experimental results show that the proposed method of building assembly cost, quality control of high precision.

    參考文獻
    相似文獻
    引證文獻
引用本文

張俊強.基于智能視覺(jué)和BIM的建筑裝配過(guò)程的高精度控制計算機測量與控制[J].,2017,25(10):66-68, 72.

復制
分享
文章指標
  • 點(diǎn)擊次數:
  • 下載次數:
  • HTML閱讀次數:
  • 引用次數:
歷史
  • 收稿日期:2017-03-21
  • 最后修改日期:2017-04-07
  • 錄用日期:
  • 在線(xiàn)發(fā)布日期: 2017-11-09
  • 出版日期:
文章二維碼
习水县| 临泽县| 浮梁县| 贵州省| 盐山县| 淄博市| 阳新县| 隆安县| 玉田县| 彩票| 美姑县| 镶黄旗| 陆丰市| 岢岚县| 济阳县| 鲁甸县| 聂拉木县| 花莲县| 称多县| 桐梓县| 上林县| 恩施市| 新源县| 大理市| 类乌齐县| 红原县| 东莞市| 卢龙县| 当阳市| 丰宁| 克山县| 敦煌市| 左云县| 娄底市| 崇仁县| 株洲县| 台安县| 怀柔区| 齐齐哈尔市| 汉沽区| 阳城县|